Technical data - equipment, parameters
The core business activity of EC Mielec includes production and distribution of heat (hot water for processing, usage and central heating) and generation of electricity.
- total installed thermal power - 170,5 MWt
- total installed electric power - 30,44 MWe
- total available electric power - 24,44 MWe
EC Mielec has two facilities:
- Elektrociepłownia "EC" - the combined heat and power plant equipped with three steam boilers, OR-64 type, and three TG-sets
- Ciepłownia "C-II" - the heating plant equipped with two water boilers, WR-25 type
The equipment of the two facilities is interconnected by thermal and electric main, enabling their full cooperation.
 |
 |
| Object "EC" |
Object "CII" |
Parameters of the power engineering equipment
| OR-64 steam boiler |
|
|
| rated power |
- |
37,5 MW |
| nominal capacity |
- |
50 t/h |
| nominal pressure |
- |
4 MPa |
| nominal temperature of fresh water |
- |
450°C |
| G1 condensing-extraction TG-set |
|
|
| nominal flow of fresh steam |
- |
55,8 t/h |
| maximum flow of steam from regulated extraction |
- |
40 t/h |
| maximum flow of outflow steam (condensation) |
- |
20 t/h |
| rated power of generator |
- |
6 MW |
| nominal voltage of generator |
- |
6,3 kV |
| |
|
|
| G2 back-pressure TG-set |
|
|
| nominal flow of fresh steam |
- |
35,6 t/h |
| rated power of generator |
- |
4 MW |
| nominal voltage of generator |
- |
6,3 kV |
| |
|
|
| G3 condensing-extraction TG-set |
|
|
| nominal flow of fresh steam |
- |
115 t/h |
| maximum flow of steam from regulated extraction |
- |
102 t/h |
| maximum flow of outlet steam (condensation) |
- |
35,03 t/h |
| rated power of generator |
- |
20,44 MW |
| nominal voltage of generator |
- |
11 kV |
| WR-25 water boiler |
|
|
| rated power |
- |
29 MW |
| nominal pressure |
- |
2 MPa |
| nominal temperature of water |
- |
155°C |
|